Engineering & Fabricated Assemblies

All finalists in this category →
Hot Gas Duct and Valve Replacement – Irish Cement
Finalist
Tusker

Hot Gas Duct and Valve Replacement – Irish Cement

Tusker

Tusker successfully delivered the replacement of the 36539 Coal Mill 3 Hot Gas Duct and Valve for Irish Cement during the plant's annual shutdown. The project required detailed planning, precision fabrication, specialist lifting operations, and efficient installation within a tightly controlled shutdown programme. The works involved the complete removal and replacement of a critical hot gas duct and valve assembly, ensuring the new system was fabricated, installed, and commissioned safely and efficiently within the allocated shutdown period.

Voting ID #77144
View

Industrial Engineering – Construction Projects

All finalists in this category →
Hot Gas Duct and Valve Replacement – Irish Cement
Finalist
Tusker

Hot Gas Duct and Valve Replacement – Irish Cement

Tusker

Tusker successfully delivered the replacement of the 36539 Coal Mill 3 Hot Gas Duct and Valve for Irish Cement during the plant's annual shutdown. The project required detailed planning, precision fabrication, specialist lifting operations, and efficient installation within a tightly controlled shutdown programme. The works involved the complete removal and replacement of a critical hot gas duct and valve assembly, ensuring the new system was fabricated, installed, and commissioned safely and efficiently within the allocated shutdown period.

Voting ID #77144
View
Lakeland Dairies Milk intake Extension
Finalist
Tusker

Lakeland Dairies Milk intake Extension

Tusker

The project scope included the partial demolition and extension of the existing milk intake canopy, construction of a new entrance road, development of a new yard area, new staff and trailer parking, two new silo plinths, a new CIP bunded area, a surface water drainage network for the expanded hardstanding, in-take pipe bridge, electrical switch room, administrator room and the extension of the effluent drainage network, along with associated works.