Shortlist announced! — Voting opens in 14 days Browse Shortlist Become a Sponsor
Home Categories Shortlist Sponsors

Industrial Engineering – Construction Projects

Production lines, optimising material flow, automation, material handling, efficiency gains.

Finished Project Award

Who Should Nominate

Teams behind production lines, automation deployments, optimised material flow and industrial engineering builds — projects that lifted efficiency or capacity on site.

Eligibility

Open to all Irish Steel members. You can nominate your own company or another member, and you can enter more than one category — just submit each entry separately.

Entries should be based on work that was completed or significantly progressed between 1 July 2024 and 30 June 2026. A handful of categories don't specify a time window — when in doubt, get in touch.

What Judges Look For

Each entry is reviewed by our judging panel. For finished projects, judges weigh:

  • Quality of the end result
  • Innovation and technical execution
  • Project complexity and scale
  • Collaboration with suppliers and clients
  • Uniqueness

Submission Requirements

Every submission needs:

  • A short project summary (50 words)
  • The story of the project (800–1,000 words) — what you built, how you solved problems, the materials and techniques, the operational excellence, innovation and technology involved
  • A strong case for why it deserves to win (up to 500 words)
  • At least two high-quality images (up to five allowed)
  • Your company logo in PNG format

Optional but welcome: video links, drawings, and media features.

Shortlisted Projects

View the shortlisted entries in this category.

Black Rock Clinic -Prefabricated Plant Room
Shortlisted
Hayes Mechanical and Engineering

Black Rock Clinic -Prefabricated Plant Room

Hayes Mechanical and Engineering

At Blackrock Clinic, Hayes M&E delivered a prefabricated steel plantroom built on a 110 mm composite concrete floor to match the hospital's frequency. Fully fitted off-site in Mayo — steel, AHU, pipework, cladding — the ~28 t module was hauled 250 km and craned into a live hospital under radioactive-dispatch and exam-restricted working hours.

View Project #35177
Castolin Eutectic Production Extension
Shortlisted
BBSF

Castolin Eutectic Production Extension

BBSF

Design, Fabricate, Powder Coat and install a three level extension to workflows and equipment supports within the Castolin Eutectic Dublin Production facility

View Project #11139
Gas Turbine Air Inlet Filter Support Structure
Shortlisted
Kerry Mechanical Engineering Ltd

Gas Turbine Air Inlet Filter Support Structure

Kerry Mechanical Engineering Ltd

KME successfully delivered the design development, fabrication, protective coating, transportation, and installation support for the Gas Turbine Air Inlet Filter Support Structure at SSE’s Tarbert Next Generation Power Station, Co. Kerry.

View Project #12166
Hot Gas Duct and Valve Replacement – Irish Cement
Shortlisted
Tusker Steelworks Limited

Hot Gas Duct and Valve Replacement – Irish Cement

Tusker Steelworks Limited

Tusker Steelworks successfully delivered the replacement of the 36539 Coal Mill 3 Hot Gas Duct and Valve for Irish Cement during the plant's annual shutdown. The project required detailed planning, precision fabrication, specialist lifting operations, and efficient installation within a tightly controlled shutdown programme. The works involved the complete removal and replacement of a critical hot gas duct and valve assembly, ensuring the new system was fabricated, installed, and commissioned safely and efficiently within the allocated shutdown period.

View Project #77144
Kerry Mechanical Engineering Ltd
Shortlisted

Kerry Mechanical Engineering Ltd - Extra Mile Award

Kerry Mechanical Engineering Ltd

View Project #52198
King & Moffatt Offsite — Prestige Automotive Manufacturing Expansion
Shortlisted
King & Moffatt Off-Site

King & Moffatt Offsite — Prestige Automotive Manufacturing Expansion

King & Moffatt Off-Site

King & Moffatt Offsite designed and delivered an industry-leading offsite MEP solution for a major prestige automotive manufacturing expansion in the south of England, eliminating approximately 12,000 on-site labour hours and delivering €1,000,000 in project value through eight large, prefabricated modules produced in our 40,000 sq ft manufacturing facility.

View Project #41187
Lakeland Dairies Milk intake Extension
Shortlisted
Tusker Construction Group

Lakeland Dairies Milk intake Extension

Tusker Construction Group

The project scope included the partial demolition and extension of the existing milk intake canopy, construction of a new entrance road, development of a new yard area, new staff and trailer parking, two new silo plinths, a new CIP bunded area, a surface water drainage network for the expanded hardstanding, in-take pipe bridge, electrical switch room, administrator room and the extension of the effluent drainage network, along with associated works.

View Project #24156

Spread the word

Know a fabricator who should be involved? Share the awards with one click.