Escape Walkway, Gresham Hotel
Dundalk Fabrication & Coatings · Dublin City Centre, Co. Dublin
Finalist in: Constructional Steelwork – Special Projects
Project Gallery
Escape Walkway, Gresham Hotel: A Challenge up High
The Story
As part of the modernisation of the Hotel a new roof access maintenance walkway has been installed to connect the new 6th Floor accommodation to the escape stairway.
A tricky little number when you are working in the centre of Dublin and need to lift the materials from the road up to the 6th floor roof level. A great deal of planning and co-ordination with the Contractor (CENEC Trading Ltd) was had, to make the operation of lifting the material, as quiet and as quick as possible. The lifting took place on a Saturday night and on into the early morning of the Sunday. This allowed the crane to be away, before any disruption to the traffic could be caused. Due to the planning and teamwork, everything went well and no disruption to the local residents or traffic occurred.
Why It Should Win
This was interesting and challenging project we taught you might like to see.
Project Team
AWL (Dublin) are the architects on board, and the Engineering is looked after by OMC (Dublin)
Project Details
Dundalk Fabrication & Coatings
Dublin City Centre, Co. Dublin
CENEC Trading Ltd.
March 2026
#81141
Share This Project
2026 Irish Steel Awards Finalist
Congratulations to Dundalk Fabrication & Coatings for being Shortlisted for an Irish Steel Award!
More in Constructional Steelwork – Special Projects
Other shortlisted projects in this category
Automated Rail Scanner Building
The Forge Mechanical Engineering
Portal Frame Steel and Cladding for housing automated Rail Car Inspection Scanning Machine
Blackrock Clinic - Prefabricated Plant Room
Hayes Mechanical & Engineering
At Blackrock Clinic, Hayes M&E delivered a prefabricated steel plantroom built on a 110 mm composite concrete floor to match the hospital's frequency. Fully fitted off-site in Mayo — steel, AHU, pipework, cladding — the ~28 t module was hauled 250 km and craned into a live hospital under radioactive-dispatch and exam-restricted working hours.
Castolin Eutectic Production Extension
BBSF
Design, Fabricate, Powder Coat and install a three level extension to workflows and equipment supports within the Castolin Eutectic Dublin Production facility