Breedon Cement Kinnegad – New Industrial Process Tower The Breedon Cement Kinnegad Process Tower project involved the design and construction of a new multi-storey industrial structure within a live cement manufacturing facility. Delivered in a highly constrained operational environment, the project enhanced the site's operational capability while maintaining strict safety, quality, and production requirements. The completed structure provides a modern, durable, and future-ready asset that integrates seamlessly into one of Ireland's leading cement production facilities.
The Story
The Breedon Cement Kinnegad Process Tower project presented a unique opportunity to deliver a significant industrial facility within the challenging environment of a fully operational cement plant. From concept through to completion, the project required careful planning, innovative thinking, and close collaboration between the client, design team, and construction partners.
The objective was to construct a new multi-level process tower that would support the continued growth and efficiency of the Kinnegad facility while integrating seamlessly with the existing plant infrastructure. The project demanded not only a technically robust solution but also one that could be delivered safely within a live industrial environment where production activities continued throughout the construction period.
One of the project's most significant challenges was working within an active cement manufacturing facility. Construction activities had to be carefully coordinated around ongoing operations, vehicle movements, existing structures, and critical plant processes. Maintaining uninterrupted production while delivering a major new structure required detailed logistical planning and a highly collaborative approach between all stakeholders.
The project team developed a phased construction strategy that allowed works to progress efficiently while minimising disruption to the surrounding facility. The compact site footprint and proximity to existing industrial infrastructure required meticulous sequencing of activities, careful management of lifting operations, and continuous coordination with plant personnel.
The completed tower features a robust structural steel frame, industrial cladding system, and external access stairways designed to provide safe and efficient movement throughout the structure. The vertical design maximised the use of available space while delivering the operational functionality required by the client. Every element was engineered to withstand the demanding conditions associated with cement manufacturing while ensuring long-term durability and ease of maintenance.
Safety was a defining feature of the project. Working at height, operating adjacent to live plant equipment, and managing multiple interfaces between construction and operational teams required rigorous planning and strict adherence to safety procedures. Through proactive management, effective communication, and a strong safety culture, the project was delivered while maintaining exceptional safety standards.
Quality and attention to detail were evident throughout the build. From structural steel installation and cladding works to access systems and external finishes, every aspect of the project was completed to a high standard. The finished tower integrates seamlessly with the existing facility and reflects the technical expertise and professionalism of the project team.
Beyond its physical presence, the project demonstrates the value of collaborative delivery and innovative problem-solving. By overcoming the constraints of a live industrial environment and successfully integrating a major new asset into an operational cement plant, the team delivered a facility that will support Breedon Cement's operational performance and future growth for years to come.
The Breedon Cement Kinnegad Process Tower stands as an example of excellence in industrial construction—combining engineering expertise, meticulous planning, outstanding safety performance, and a commitment to delivering lasting value for the client.
Why It Should Win
The Breedon Cement Kinnegad Process Tower project deserves recognition for successfully delivering a complex industrial structure within the demanding environment of a live cement manufacturing facility.
What distinguishes this project is the team's ability to combine technical excellence, safety leadership, and collaborative project delivery while maintaining uninterrupted site operations. The successful integration of a major new structure within an active production environment required exceptional planning, coordination, and execution.
The project demonstrates innovation through its construction methodology, stakeholder engagement, and ability to overcome significant site constraints. Working around existing infrastructure, ongoing manufacturing activities, and restricted access demanded creative solutions and meticulous attention to detail at every stage of the project.
The completed tower not only meets the immediate operational requirements of Breedon Cement but also provides long-term value through its durability, functionality, and future adaptability. The structure enhances operational efficiency, improves accessibility, and strengthens the capability of the Kinnegad facility for years to come.
Most importantly, the project exemplifies the highest standards of industrial construction. It showcases how effective collaboration, engineering expertise, and a commitment to safety and quality can transform a challenging brief into a successful and enduring asset. The result is a project that delivers measurable value to the client while setting a benchmark for excellence in industrial construction.
Project Team
The successful delivery of the Breedon Cement Kinnegad Process Tower was the result of a highly collaborative effort involving the client, design professionals, project management team, specialist subcontractors, suppliers, and site personnel. Breedon Cement – Client and project stakeholder, providing operational input and support throughout all phases of the project. Ryan Structural Steel Services – Fabricated and erected the structural steel framework and access structures.
Project Details
Ryan Structural Steel Services
Kinnegad
Breedon Cement
June 2025
#26111
Share This Project
2026 Irish Steel Awards Finalist
Congratulations to Ryan Structural Steel Services for being Shortlisted for an Irish Steel Award!
More in Constructional Steelwork – Buildings
Other shortlisted projects in this category
Black Rock Clinic -Prefabricated Plant Room
Hayes Mechanical and Engineering
At Blackrock Clinic, Hayes M&E delivered a prefabricated steel plantroom built on a 110 mm composite concrete floor to match the hospital's frequency. Fully fitted off-site in Mayo — steel, AHU, pipework, cladding — the ~28 t module was hauled 250 km and craned into a live hospital under radioactive-dispatch and exam-restricted working hours.
Castolin Eutectic Production Extension
BBSF
Design, Fabricate, Powder Coat and install a three level extension to workflows and equipment supports within the Castolin Eutectic Dublin Production facility
Ceannt Station Redevelopment
Swift Engineering Services and Sales
Redevelopment of Ceannt station