Ceannt Station Redevelopment
Swift Engineering Services and Sales · Galway city
Finalist in: Constructional Steelwork – Buildings
Project Gallery
Redevelopment of Ceannt station
The Story
Design detail and fabrication of multiple steelwork buildings in Ceannt station in the heart of Galway city.
Subcontract included the design, fabrication and installation of multiple smaller buildings throughout the station including the new entrance facades and canopies ultimately falling under the centre-piece of the project, the Main station roof.
This roof consisted of 30 no.25 meter long rolled Rectangular Hollow section Trusses, each one designed in 3 main sections fabricated in Co. Louth and transported by by an escorted Low-Loader during the night to Ceannt station.
They were assembled on site with a 200 ton crane, some weighing 5 ton and fitted at night over live tracks.
Specification for same was using full penetration butt welds, ground flush, which were then painted to Irish Rail P3 ,three coat paint system to approved paint specification.
The roof was fitted between the live tracks and joined to the live Hardiman Hotel at either end.
Trusses were then braced together with hundreds of Circular Hollow section braces and Stainless steel Macalloy adjustable threaded rods.
This roof design was copied but in a smaller scale to cover the Engine shed which was then roffed in Zinc.
Each roof was designed to align with with existing walls and curved arches and columns which were to be maintained to their original glory built in the 1900s with movement joints each side of the structure.
Why It Should Win
The Design of the main roof steel to incorporate the Designs teams wishes of hidden welds whilst still maintaining the structural integrity of the Trusses was like no other project we have ever completed.
The hundreds of man hours of polishing and grinding welds over the months of fabrication were made worthwhile when we seen the finished project, like no other in the country.
The first Truss of each Phase of installation could not support itself without temporary works bracing until its sister truss was installed for support.
The Transport across the country in itself with a wide load escorted lorry during the night to tie in with our erectors and Crane supervisors on site.
The attention to detail by the Design Team and our own designers and fabrication team was to a standard like no other in our History.
Project Team
Swift Engineering Ltd. Crobim (Design and Detail) Paul Sherlock Connection Design API Painting PJ Warde Transport Walsh Crane Hire Dromad Hire Access Barretts Steel
Project Details
Swift Engineering Services and Sales
Galway city
BAM
December 2025
#42186
Share This Project
2026 Irish Steel Awards Finalist
Congratulations to Swift Engineering Services and Sales for being Shortlisted for an Irish Steel Award!
More in Constructional Steelwork – Buildings
Other shortlisted projects in this category
Black Rock Clinic -Prefabricated Plant Room
Hayes Mechanical and Engineering
At Blackrock Clinic, Hayes M&E delivered a prefabricated steel plantroom built on a 110 mm composite concrete floor to match the hospital's frequency. Fully fitted off-site in Mayo — steel, AHU, pipework, cladding — the ~28 t module was hauled 250 km and craned into a live hospital under radioactive-dispatch and exam-restricted working hours.
Breedon Cement SRF Facility
Ryan Structural Steel Services
Breedon Cement Kinnegad – New Industrial Process Tower The Breedon Cement Kinnegad Process Tower project involved the design and construction of a new multi-storey industrial structure within a live cement manufacturing facility. Delivered in a highly constrained operational environment, the project enhanced the site's operational capability while maintaining strict safety, quality, and production requirements. The completed structure provides a modern, durable, and future-ready asset that integrates seamlessly into one of Ireland's leading cement production facilities.
Castolin Eutectic Production Extension
BBSF
Design, Fabricate, Powder Coat and install a three level extension to workflows and equipment supports within the Castolin Eutectic Dublin Production facility