Project Gallery
ODS Engineering successfully delivered the complete structural steelwork package for the University Hospital Kerry 30-bed extension in Tralee, Co. Kerry. The project involved the installation of two additional floors of steelwork and composite decking above an operational hospital, requiring detailed planning, precise execution, and strict adherence to safety procedures. The extension significantly increases healthcare capacity for the region, providing modern accommodation and improved patient facilities.
The Story
ODS Engineering successfully delivered the complete structural steelwork package for the University Hospital Kerry 30-bed extension in Tralee, Co. Kerry. The project involved the installation of two additional floors of steelwork and composite decking above an operational hospital, requiring detailed planning, precise execution, and strict adherence to safety procedures. The extension significantly increases healthcare capacity for the region, providing modern accommodation and improved patient facilities.
Leveraging advanced technologies such as Trimble X7 point-cloud scanning, BIM-integrated detailing and automated CNC fabrication, ODS ensured exceptional accuracy and programme certainty throughout the project. Despite the complexities associated with working within a live healthcare environment, the works were delivered efficiently while maintaining the highest standards of quality, health, and safety.
The project demonstrates ODS Engineering's expertise in complex steel construction and highlights the vital role of structural steel in delivering sustainable, adaptable, and future-proof healthcare infrastructure. The successful completion of this landmark development reinforces ODS's reputation as one of Ireland's leading structural steel specialists.
Key Achievements
320 tonnes of structural steelwork delivered and installed.
Two-storey vertical expansion constructed over an existing hospital facility.
Advanced digital surveying and fabrication technologies employed.
Enhanced healthcare capacity through a new 30-bed extension.
Delivered with a strong focus on safety, quality, and programme performance.
Scope of Works
Supply, fabrication and installation of structural steelwork, metal decking and associated works for the construction of a new 30-bed hospital extension over the existing two-storey healthcare facility.
Steel Tonnage
320 tonnes
Why It Should Win
n/a
Project Team
Scott Tallon Walker Architects / Arup Engineers
Project Details
ODS Engineering
Kerry
#103164
Share This Project
2026 Irish Steel Awards Finalist
Congratulations to ODS Engineering for being Shortlisted for an Irish Steel Award!
More in Constructional Steelwork – Buildings
Other shortlisted projects in this category
Black Rock Clinic -Prefabricated Plant Room
Hayes Mechanical and Engineering
At Blackrock Clinic, Hayes M&E delivered a prefabricated steel plantroom built on a 110 mm composite concrete floor to match the hospital's frequency. Fully fitted off-site in Mayo — steel, AHU, pipework, cladding — the ~28 t module was hauled 250 km and craned into a live hospital under radioactive-dispatch and exam-restricted working hours.
Breedon Cement SRF Facility
Ryan Structural Steel Services
Breedon Cement Kinnegad – New Industrial Process Tower The Breedon Cement Kinnegad Process Tower project involved the design and construction of a new multi-storey industrial structure within a live cement manufacturing facility. Delivered in a highly constrained operational environment, the project enhanced the site's operational capability while maintaining strict safety, quality, and production requirements. The completed structure provides a modern, durable, and future-ready asset that integrates seamlessly into one of Ireland's leading cement production facilities.
Castolin Eutectic Production Extension
BBSF
Design, Fabricate, Powder Coat and install a three level extension to workflows and equipment supports within the Castolin Eutectic Dublin Production facility