Shortlist announced! — Voting opens in 14 days Browse Shortlist Become a Sponsor
Home Categories Shortlist Sponsors
The Forge (Walls) Mechanical Engineering

Maynooth Train Station

The Forge (Walls) Mechanical Engineering · Maynooth, Co. Kildare, Ireland

Finalist in: Constructional Steelwork – Civil Works

Irish Steel Awards
Maynooth Train Station
Voting ID
#90130

Project Gallery

Works for the upgrading of rail service facilities and user accessibility to Maynooth Rail Station as part of a wider infrastructure upgrade project.

The Story

This project, which was undertaken by our client, was part of a nation-wide initiative to upgrade and improve the services at all rail stations across Ireland. The Forge Mechanical Engineering was one of many specialist contractors involved and supplied the steelwork required. Much of the steelwork was inhouse engineered by our manufacturing team in accordance with our clients’ specifications, prior to transportation to site.

Working alongside our client, our involvement included steel fabrication, site installation and remedial works. The project aims were to increase access for disability users, improve on an ageing/outdated infrastructure and increase function ability/capacity.

Our multidisciplinary teams drafted, fabricated and installed all steel elements including:

• New pedestrian footbridge spanning over railway tracks

• Two new accessibility platform elevators

• New platform/carpark access ramps

• Remedial works to platforms and station

Materials used in the project include:

• Various types of Mild Steel for the main structure

• Goosewing Grey Seamlap Roofing panels

• Vulcan UV protected GRP Panels, shallow crinkle finish.

Completion of this project is part of the client’s future vision to make Irelands transport services accessible to all. The design and inclusion of lifts and access ramps to the platforms plays a huge role in achieving this objective, as without them it would not be possible.

Why It Should Win

The project is an important step in our future infrastructure, as the country has faced rapid population growth over the last decade and outdated transport facilities cannot cater to the increasing commuter numbers. As part of a nationwide initiative, major investment has been put into stations across the country such as Maynooth with the vision of improving much needed transport services in many ways including:

• Making Irish rail station services more accessible to all users, including disability users who require extra services to use the rail facilities. Sadly current facilities at many stations prevent disability users from accessing rail services. The new station infrastructures allow access to the stations and their services.

• Accommodating a growing commuter population using the existing rail services both ways to and from Dublin for work purposes daily.

• Providing improved transport services for the university population, a sector of which is rapidly expanding in the last number of years due to increasing rent prices and lack of accommodation availability.

Collaborating with our client and their design team on this project, we carried out the steelwork required as with many of the other stations nationwide that saw the same or similar upgrades, as part of a huge nationwide transport infrastructure improvement project. It challenged us in terms of time restrictions and strict deadlines, as the station was open throughout the project. This meant some installation elements needed to be efficient and at certain times, such as lifting the bridge into place required overnight installation only after the daily train services had finished.

This project also plays an enormous role in improving daily life for disability users, truly making a difference in people’s lives. Together with our clients we realise the importance of working towards a future of inclusivity and accessibility, and we believe this project is one that may forge a future of altered design thinking to include all types of service users.

We as the steel specialist contractor were proud to be part of another station upgrade which is working towards improvements for our future and the future of the upcoming Irish population.

Project Team

The team on this project included: The Client: Iarnród Eireann Main Contractor: Global Rail Services (Our Client) Specialist Contractor: The Forge Mechanical (Specialist Steel Contractor) Design Team: GCP Applied Technologies / Irish Rail

Project Details

The Forge (Walls) Mechanical Engineering
Company

The Forge (Walls) Mechanical Engineering

Location

Maynooth, Co. Kildare, Ireland

Client

Iarnród Eireann / Global Rail Services

Completed

May 2026

Voting ID

#90130

Share This Project

2026 Irish Steel Awards Finalist

Congratulations to The Forge (Walls) Mechanical Engineering for being Shortlisted for an Irish Steel Award!