In North Donegal, a 1980s factory space, once a dark, flat-roofed warehouse, has been transformed into a modern workspace with new offices, new roofing, air-to-water heating, and daylight harvesting via raised roof lights, ensuring longevity for decades.
The Story
Built in the late 1970s/early 1980s as an Advance Factory, this unit is one of several similarly designed industrial buildings found throughout the West Donegal Gaeltacht. It featured an open-plan warehouse with small office accommodation and a flat roof, offering little daylight. These buildings served the community well, accommodating manufacturing companies with production space and facilities and bringing much-needed employment into the area, particularly for new and emerging businesses.
However, in the early 2000’s, many of these buildings became vacant, either as the companies occupying them outgrew their size or, in many cases, as manufacturing came under pressure from abroad and closed.
In 2002, the building was occupied by another new enterprise, Kelsius, who again were a start up company, focusing on wireless temperature monitoring and digital compliances. From there, the company went on to design, manufacture, install and support their hardware and software solutions serving customers globally across healthcare, pharmaceutical, food retail and hospitality. With business growth came additional employment and a need for more modern facilities, along with additional office accommodation in their existing building.
Working alongside Axis Construction, Carr & Associates Architects and Structural Engineers, not only have updated offices been added to the building, but the existing building has been transformed from what was once a dark and cold building into a modern workspace. Improvements include a new roof fabric, an air-to-water heating system, and daylight harvesting via ten raised roof lights, which allow significant natural light into the space, with all upgrades finished to a modern specification.
This project required extending and refurbishing an existing two-storey factory, with works delivered in three phases: a new structural bay added to the rear, a full roof refurbishment (insulation, PVC membrane, new gutters and flashing), and a complex side extension featuring a distinctive cranked and curved design. Working closely with Axis Construction and Carr & Associates Architects from the design stage, the team handled detailing, fabrication, supply and installation of steelwork, purlins, side rails and cladding. Close collaboration between design, fabrication and site teams ensured the new structure tied seamlessly into the existing building.
The intensity of the build process required that Kelsius be relocated to temporary premises for the duration of the build, but they are soon to be back in their modern updated accommodation in a building offering an ideal workspace, finished to a build specification that will see the longevity of the building for many decades to come.
Why It Should Win
The scope of works included a new two-storey building alongside the refurbishment of the existing facility, delivering improved office space, workshops, staff facilities, storage, and plant room.
McMenamin Engineering supplied and erected the structural steel for the extension. In addition, we overlaid the entire roof with insulation and a new roof fabric of IKO rubber membrane material. This building, which was once a cold, empty warehouse with limited use, has today been transformed into a new, modern and vibrant building. The new external fabric upgrade meets all of today’s building specifications, where both new and old complement each other and sit together as an example of modern design and craftsmanship.
We do not doubt that the entire team involved in its transformation have taken particular pride in knowing that up here in the North West corner of Ireland, in Donegal, they have enhanced the daily work life of the people who work in the building and secured not only the much-needed employment within the area but also transformed the building and given it a new lease of life for generations to come.
Project Team
McMenamin Engineering. Axis Construction. Carr & Associates Architects
Project Details
McMenamin Engineering
Falcarragh, Co. Donegal
Udaras Na Gaeltachta
#32152
Share This Project
2026 Irish Steel Awards Finalist
Congratulations to McMenamin Engineering for being Shortlisted for an Irish Steel Award!
More in Constructional Steelwork – Buildings
Other shortlisted projects in this category
Black Rock Clinic -Prefabricated Plant Room
Hayes Mechanical and Engineering
At Blackrock Clinic, Hayes M&E delivered a prefabricated steel plantroom built on a 110 mm composite concrete floor to match the hospital's frequency. Fully fitted off-site in Mayo — steel, AHU, pipework, cladding — the ~28 t module was hauled 250 km and craned into a live hospital under radioactive-dispatch and exam-restricted working hours.
Breedon Cement SRF Facility
Ryan Structural Steel Services
Breedon Cement Kinnegad – New Industrial Process Tower The Breedon Cement Kinnegad Process Tower project involved the design and construction of a new multi-storey industrial structure within a live cement manufacturing facility. Delivered in a highly constrained operational environment, the project enhanced the site's operational capability while maintaining strict safety, quality, and production requirements. The completed structure provides a modern, durable, and future-ready asset that integrates seamlessly into one of Ireland's leading cement production facilities.
Castolin Eutectic Production Extension
BBSF
Design, Fabricate, Powder Coat and install a three level extension to workflows and equipment supports within the Castolin Eutectic Dublin Production facility