Last chance to nominate, the extended deadline is almost here — Closes in 5 days Nominate Now Become a Sponsor
Home Categories Sponsors
This project is from the 2023 Irish Steel Awards
View 2023 Winners
Tusker Steelworks Limited

Environmental & Sustainability 2023

Tusker Steelworks Limited

Finalist in: Environmental & Sustainability

Irish Steel Awards
Tusker Steelworks Limited
Voting ID
#0036

The Story

Tusker employs 150 direct employees and has evolved through the sectors of construction to Groundworks, Steel Fabrication, Haulage, and Crane Hire, and now includes the circular economy. This includes a bespoke one-to-one experience of design fabrication installation and commissioning of our Waste Recycling equipment along with support and 24/7 service to our loyal customers.

The project we are putting forward for this award is a complete consultation, design, and installation for our valued and esteemed client Beauparc Group. Their busy Waste Recycling facility in Bournemouth required increased throughput with Zero downtime and this is where Tusker exceled.

The design stage has seen vigorous one-to-one consultation to ensure the client's goal of reducing 30 hours of processing hours a week was met.

The equipment has improved the extractions fines for the MBT via two of our new T6000 trommels and 312liniar meters of our CV1200 heavy-duty conveyors all improving the quality of material to the required CV (Calorific Value) spec for the local new EFW (Energy from waste facility)

The new installation had the added benefit of producing loose material for delivery via walking floors alongside baling RDF material for export.

The waste stream included a larger magnet for the extraction of metals and a new Eddie current for the extraction of aluminum which suited our client's requirements.

Fully scheduled installation with Just in Time delivery resulted in Zero downtime across the Christmas and New Year period and did not affect the acceptance of material from 3 local authorities through the busiest time of year and we completed it on schedule.

and installation.

Tusker is focused on innovative solutions for the global waste industry while having a consistent commitment to providing the best service and support for the client.

Testimonials from our client

“A quality job from a company that designed, manufactured, and installed our new highly effective equipment which has enhanced the efficiency of our process. And they made it look easy. Great job guys!”

“Tusker’s backup service is second to none. Their teams in the UK provide around-the-clock essential maintenance and are on-site almost as soon as you’ve put down the phone.”

Why It Should Win

Tusker employs 150 direct employees and has evolved through the sectors of construction to Groundworks, Steel Fabrication, Haulage, and Crane Hire, and now includes the circular economy. This includes a bespoke one-to-one experience of design fabrication installation and commissioning of our Waste Recycling equipment along with support and 24/7 service to our loyal customers.

The project we are putting forward for this award is a complete consultation, design, and installation for our valued and esteemed client Beauparc Group. Their busy Waste Recycling facility in Bournemouth required increased throughput with Zero downtime and this is where Tusker exceled.

The design stage has seen vigorous one-to-one consultation to ensure the client's goal of reducing 30 hours of processing hours a week was met.

The equipment has improved the extractions fines for the MBT via two of our new T6000 trommels and 312liniar meters of our CV1200 heavy-duty conveyors all improving the quality of material to the required CV (Calorific Value) spec for the local new EFW (Energy from waste facility)

The new installation had the added benefit of producing loose material for delivery via walking floors alongside baling RDF material for export.

The waste stream included a larger magnet for the extraction of metals and a new Eddie current for the extraction of aluminum which suited our client's requirements.

Fully scheduled installation with Just in Time delivery resulted in Zero downtime across the Christmas and New Year period and did not affect the acceptance of material from 3 local authorities through the busiest time of year and we completed it on schedule.

and installation.

Tusker is focused on innovative solutions for the global waste industry while having a consistent commitment to providing the best service and support for the client.

Testimonials from our client

“A quality job from a company that designed, manufactured, and installed our new highly effective equipment which has enhanced the efficiency of our process. And they made it look easy. Great job guys!”

“Tusker’s backup service is second to none. Their teams in the UK provide around-the-clock essential maintenance and are on-site almost as soon as you’ve put down the phone.”

Project Details

Tusker Steelworks Limited
Company

Tusker Steelworks Limited

Voting ID

#0036

Archive

2023 Awards

Voting has closed for this edition

Share This Project

2023 Irish Steel Awards Runner Up

Congratulations to Tusker Steelworks Limited for being named Runner Up at the Irish Steel Awards!