Murphy International | M62 Motorway Bridge Replacement, UK

Finalist In: Finished Projects | Constructional Steelwork – Civil works
Project Story:

The MVN2/48A M62 Bridge Replacement was a technically demanding project delivered by Murphy for Network Rail. The existing post-tensioned concrete structure, built in 1969, had reached the end of its service life and required full replacement.

Located between Junctions 19 and 20 of the M62, a key freight route supporting Drax Power Station, the works were critical to national infrastructure.

Appointed as Principal Contractor in September 2023 through Early Contractor Involvement, Murphy undertook demolition of the original structure and installation of a new 42-metre-long, 9-metre-wide steel bridge. With 120,000 vehicles using the motorway daily, the works were delivered under two full motorway closures, the first in the M62’s history.

Murphy fabricated the bridge off-site at its Newbridge facility in Ireland using S355K2W weathering steel for corrosion resistance and long-term durability. A full digital model in Tekla Structures enabled real-time design approvals and efficient procurement. The bridge was constructed 500 metres from its final position and transported using 5-axle bogies.

A bespoke pre-assembly method allowed gradual adjustment during installation, with PTFE-bearing trestles, bolting channels, and jacking points enabling millimetre-accurate positioning via Self-Propelled Modular Transporters. Bearing pockets were cast in-situ using laser survey data to match the trial build.

Sustainability measures included warm mix asphalt, GRP walkways, and reuse of existing pier and abutments, reducing embodied carbon by over 28 tonnes.

All steelwork was fabricated to Execution Class 3, with 1,500 steel plates and 9,750 kg of weld wire used. Delivered safely and on time, the project met all stakeholder expectations.

The Nominee Says

The MVN2/48A M62 Bridge Replacement project is a standout example of what true collaboration can achieve. From concept to delivery in under 12 months, it brought together engineering ambition, programme constraint, and aligned teamwork.

At preliminary design stage in September 2023, the bridge was fully designed, fabricated, and installed within a year. The 42-metre structure, comprising 70-tonne girders, was fully assembled off-site and installed with millimetre precision over one of the UK’s busiest motorways. With no margin for delay, every decision had to be right first time.

Murphy and Network Rail worked as one integrated team from Early Contractor Involvement, sharing accountability and driving concurrent progress on design, approvals, and fabrication. Murphy’s internal teams operated as a single unit, with fabrication treated as critical path and trial assemblies used to de-risk installation.

Collaboration extended across the supply chain, including National Highways and haulage teams, to safely transport and install the structure using Self-Propelled Modular Transporters. Shared Tekla models enabled real-time design reviews and approvals, ensuring fabrication began with full confidence.

The project was delivered ahead of schedule with no incidents. Reusing the original substructures avoided demolition of over 300 cubic metres of concrete. This project reflects the best of Irish steelwork delivery: technical precision, shared ownership, and results-driven execution.

Share This Project on Social Media

2025 Irish Steel Awards Finalist

Congratualations to Murphy International for being Shortlisted for an Irish Steel Award!

2025 Sponsors

HEADLINE SPONSOR

Lead Sponsors

Affiliate Sponsors

Interested in sponsorship?

Have a question?

Give us a call on +353 57 86 70629

Ireland Address

Contact us at: [email protected]
The Certification Hub, Unit 2 – Zone 5, Clonminam Business Park, Portlaoise, Co. Laois, R32 W2RW

Copyright © 2025 - All rights reserved. Made with 💖 by Irish Steel

GDPR Policy

Vote for the project you'd like to see win the Façade Systems - award below

Vote for the project you'd like to see win the Restoration Projects - award below

Vote for the project you'd like to see win the Architectural Metalwork - Special Projects - award below

Vote for the project you'd like to see win the 
Mechanical Engineering - award below

Vote for the project you'd like to see win the 
Architectural Metalwork - Balconies award below

Vote for the project you'd like to see win the 
Finished Projects - Unique Metalwork award below

Vote for the project you'd like to see win the 
Architectural Metalwork - Boundaries (Gates, Railings, Doors, Fences, Screens etc.) award below

Vote for the project you'd like to see win the 
Architectural Metalwork - Staircases award below

Vote for the project you'd like to see win the 
Industrial Engineering - Equipment Manufacturing award below

Vote for the project you'd like to see win the 
Structural Steel - Bespoke award below

Vote for the project you'd like to see win the 
Constructional Steelwork – Civil works award below

Download the 2025 irish steel awards Shortlist

Shortlist Download

Vote for the project you'd like to see win the constructional steelwork award below

Download the 2025 irish steel awards nomination guide

Nomination Guide Download
REGISTER INTEREST

Get Involved in The 2024 Irish Steel Awards

Register Award Interest